Laser screed high tolerance slabs – Deighton waste water treatment works
Working for JN Bentleys throughout 2024 at their site at Deighton WWTW in Huddersfield. We refurbed 8 1000m2 PTS Tanks, these had to be within a 5mm tolerance with several construction joints per pour.
We at G&F Formwork took on the full package working hand in hand with one of our specialised floor laying partners who drove the laser machine to bring the fibre reinforced concrete slabs to tolerance using KForm joints to pour 100m3 per pour
I am proud to say this job was completed months before our orignally programmed dates due to JN Bentleys and G&F working hand in hand. All slabs was in tolerance without the need for any remedials and as such we are working on several other projects with this client already in 2024 and beyond